This article was created with the AI assistant Claude and published by Peter Hoenig.

The question almost always comes too late. It is Monday morning, a server is not answering, and everyone in the room is wondering what exactly has stopped. Usually nobody knows for certain. People ring round, try things out, and two hours later it turns out that despatch is affected too – because the warehouse program pulls its article data from a system nobody in the room had thought of.
That question can be answered beforehand, in a workshop lasting half an hour. That is what the outage simulation is for.
How the workshop goes
First the business processes go on the wall – the ones that matter: take an order, despatch goods, issue an invoice, run payroll. Then the applications, services and servers underneath. You connect them with the right mouse button: “connect from here”, then click the target. Every connection means the same thing – needs.
Then the interesting part begins. Somebody clicks the power supply of building 1 and ticks “goes down”. The effect immediately runs up the chain: server A fails, with it the database, with that the ERP system – and with that three of four business processes. The fourth, payroll, stays up because it hangs off a different strand.
That is the moment when a technical drawing turns into a conversation about the business. Because the next question is no longer “which server is that?” but: how long can we live with this?
Representing redundancy honestly
Many dependency diagrams are too pessimistic because they have no notion of standby paths. So for every element you can set how it needs what feeds it:
- all – the default. If one fails, the element fails.
- one is enough – the element only fails once all of its inputs have failed. Two internet providers, two data centres, two directory services.
- at least n of several – for clusters where three of five nodes must be running.
On top of that there is the connection type “stands in (standby path)”, drawn in green and dashed. It absorbs the failure of the ordinary inputs for as long as it is available itself.
The weak-point list
The most useful button is on the right: find weak points. The tool works through every single element and calculates what would happen if that one failed – then ranks the elements by how many business processes they bring to a halt on their own. The current scenario is left untouched.
Whatever sits at the top of that list is a single point of failure: an element with no standby path that more depends on than anyone realised. In my experience it is rarely the most expensive server. More often it is a small service somebody set up on the side years ago and which has been holding everything together ever since – name resolution, a certificate service, a file on a desktop machine.
A different scenario every time
The most common mistake with an outage simulation is never opening it again after the first time – or playing through the server everyone thinks of anyway, every time. For the quarterly ritual – ten minutes, a different system – there is “💡 Suggest another scenario” on the right.
The suggestion is not random but follows a fixed order: first what has never been played through and on its own would hit the most business processes, then what has not been played through for the longest time. The scenario played last never comes up, elements without any effect come last. “Another suggestion” moves to the next one, “⚡ Play through” sets exactly this element to “fails” and stores the scenario with its date in the file; a scenario set by hand is recorded with “📌 Record scenario”. “Played through so far” shows what failed when and how many processes it hit, the report the whole list. Important: save the file after every round – only then does the tool know next time what has already been played.
What the tool is not
It does not calculate probabilities and it does not replace a business impact analysis to ISO 22301. Nor does it check whether the dependencies you entered are correct – it takes them as you write them down. What it does: in a short time it makes visible what hangs together, and it forces the group to make a statement about every single connection. The assessment and the measures remain your decision and belong in your continuity planning.
For downtime and service level agreements there is the availability calculator alongside it, and for the operations view the service tree.
From the workshop into the model
A sketch stays a sketch if it sits in a file. So there is a way in and a way out:
- In: a saved model file from the 8EM modeller is read in. It becomes processes, applications and components; the interfaces maintained there become dependencies, and so do the links between processes and systems. Inside the MC4Y productivity suite the configuration items from the CMDB come along too, with their dependencies if you wish; name, status, owner and location stay synchronised with the CMDB. Without the suite the tool reads a CMDB export.
- Out: a table that the modeller reads via “Import › ⬆ Bulk import (Excel/CSV)”. Identical names count as an update there – no duplicates are created. Inside the suite, new elements and dependencies can also go into the CMDB, without duplicates and without touching relationships maintained by hand.
That makes the outage simulation exactly what it is meant to be: the quick way in, after which you know whether the full model is worth it.
Functions at a glance
- Elements: On the left under “New entry” there is one button each for “Business process”, “Application”, “Service / platform”, “Server / infrastructure” and “External service”. For business processes you also enter “How quickly does the outage become critical?” and “Maximum tolerable downtime”; both appear with the affected processes in the analysis.
- Scenario: “Fails in this scenario” on the right or “⚡ fails (scenario)” with the right mouse button sets an outage; “Reset all outages” starts afresh. “Show only the affected chain” hides everything else.
- Connections: Click a line to switch its type between “needs (fails with it)” and “stands in (alternative route)”; “⇄ Reverse direction” turns the arrow round.
- Export: “Export ▾” produces the picture as “PDF (A4 landscape)”, “PDF (A3 landscape)”, “PowerPoint (.pptx)”, “LibreOffice Impress (.odp)”, “Visio (.vsdx)”, “SVG” or “PNG image”; “Print report” contains the picture, all entries and the analysis, “Entries as a table (CSV)” is for Excel.
- Operation:
Deldeletes the selection,F2jumps to the name field,Ctrl+Zundoes. On a phone, “+ Elements” and “✎ Properties” open the panels.
Integration: maintain once, use everywhere
My principle for all the tools: a piece of information is maintained once and is then available wherever it is needed. For the outage simulation that means:
- Master data: the owners of the elements can be linked to the master data; if a name changes there, the change arrives here.
- CMDB: you take applications, services and servers from the CMDB of the MC4Y productivity suite – without the suite, from its export file. The tool keeps linked elements in step: the CMDB leads for name, owner and location, and a system that has been switched off or no longer exists gets a ⚠. The CMDB’s relationships (“uses”, “runs on”, “supplies data to”, “is part of”) become “needs” connections – even when the same component appears twice in the picture. Inside the suite you can write new elements and connections back.
- ITSM: no direct connection. You analyse incidents in the incident timeline.
- Tasks and Kanban: not intended – the simulation shows weak points; the measures for them are created in the five whys or the pre-mortem and are passed on as tasks from there.
- Impact network: the factors and effects from the impact network come in via “🔗 Connection › 🕸 From the Impact Network” – as a handover in the same browser or in the suite, or from the saved file. Every factor becomes an element (you choose its type in the preview), every same-direction effect “A acts on B” a dependency “B needs A”. This is how you test whether a lever shown by the impact network holds when it matters.
- Other tools: systems from the IT map come in via a handover; the dependency chain of a process goes to the availability calculator.
Without the suite everything runs in the browser – via files and handovers within the same browser; nothing leaves your computer.
Frequently asked questions
How do factors from the impact network get into the outage simulation?
In the impact network, click “📤 Hand over to Outage simulation and 8EM Modeller” on the right under “📤 Use further”. The outage simulation then shows the notice “An Impact Network is ready” (or choose “🔗 Connection › 🕸 From the Impact Network”). The preview lists every factor with its role and suggests a type: reactive and highlighted factors as a business process, the others as a service – you can change each type or leave a factor out. Same-direction effects become “needs” dependencies; opposite-direction effects say nothing about what fails along with it and are not taken over. Then set a failure with “⚡ fails” and see what goes down with it. Identical names count as the same element – nothing is created twice.
How do I play through a different system every quarter?
Open the saved file and choose “💡 Suggest another scenario” on the right. The suggestion says when the element was last played and which business processes its failure alone would hit; “⚡ Play through” sets the failure and records the scenario, “Another suggestion” moves to the next one. Then save the file. The scenario played last is never suggested, and the order is fixed – ask twice and you get the same sequence twice.
The outage simulation is free of charge and available as free software under the GPL: open the outage simulation. If you would like to put your IT landscape and the processes around it in order as a whole, I am happy to support you with IT-supported organisational consulting – get in touch for a free initial consultation.
Open or download the tools
- Availability and SLA (per cent, downtime, chains)Open Download (764 KB)
- Service catalogue as a treeOpen Download (771 KB)
- 8EM modellerOpen Download (3.8 MB)
- Master data (people, roles, organisation)Open Download (681 KB)
- Incident timeline and reviewOpen Download (772 KB)
- Five whys (chain of causes)Open Download (757 KB)
- Pre-mortem (finding the risks nobody says out loud)Open Download (800 KB)
- IT map in 30 minutesOpen Download (761 KB)
- Outage simulation (what fails if this one fails?)Open Download (814 KB)
Thinking further
You can find more on this topic under enterprise architecture management consulting – or talk to me directly in a free initial consultation.